5 Key Factors To Consider When Installing A Rooftop Solar Panel In Maharashtra

Due to the availability of ample solar energy in the region, Maharashtra offers an excellent opportunity to harness green energy by installing rooftop solar panels. It will further add to the country’s decarbonising. As per the data, solar power capacity in India almost doubled between 2018 and 2021, approaching 40 gigawatts in the latter year.

However, in 2022, the numbers jumped to 63 gigawatts. To reach the targeted production in 2030, there is a need for the solar installed capacity to grow four times.

This can be seamlessly achieved by opting for rooftop solar in Maharashtra and other states. However, before starting with solar installations, one must consider certain parameters.

Top 5 Factors To Consider For Rooftop Solar Panel Installation

Accurate Positioning of the Solar Panel

When installing rooftop solar in Maharashtra, determine the orientation and position of the panels for harnessing maximum clean energy. For instance, in winter the panels must be vertical to make up for diffused sunlight due to atmospheric scattering.

Meanwhile, in summer the panels must be adjusted horizontally to capture maximum sunlight. Thus, the angular position of the panels will change based on the time of the year and latitude.

Consider the Condition of the Roof

Before starting the installation of solar panels, check the rooftop’s condition. It will give you a fair idea about its capacity to withstand the weight of the panels throughout their lifetime. Additionally, ensure that the rooftop slope is appropriate for water drainage during the rainy season.

Secure the panels to your roof using a superior-quality chemical anchoring technique to prevent leakage. Check whether the rooftop’s current condition allows that.

Check the Availability of Space

Installing rooftop solar in Maharashtra requires reasonable space to generate optimum clean energy. Thus, before you proceed with anything, check the space available. It must be enough for the panels and maintenance access around them.

Thus, the layout should be planned accordingly, considering the rooftop space available and the building safety codes and regulations. One must also consider the future scope of solar panel extension before starting with the installation process.

Availability of Regular Maintenance

Regularly maintaining rooftop solar Maharashtra is the key to extracting maximum efficiency from the panels installed. Thus, ensure you consistently monitor the panels for inconsistencies so appropriate measures can be taken on time.

Take the help of professional service providers who offer expert cleaning services and regular health checks of the panels. It will also help prevent potential issues that can be tackled before they become a big problem.

You must pick the best quality solar panels to minimise maintenance requirements.

Chalk Out Financials

When looking forward to a rooftop solar in Maharashtra, finance plays an important role. Thus, before proceeding with panel installation, chalk out the initial investment requirements, available government subsidies, and estimated return on investment.

You can also explore the various loan and lease schemes available for solar equipment purchase and installation. Further, analyse the estimated savings on electricity bills, owing to the solar project. Thus, having a detailed financial plan will help you economically in the long run.

Cash On Solar Power: Learn About Government Subsidies

PM Surya Ghar Muft Bijli Yojana subsidy scheme initiated by the Indian government applies specifically to residential households. It has been designed to promote the maximum use of renewable energy and reduce electricity bill costs for families. In case you are wondering about subsidy rates, they are as follows:

  • Rooftop solar capacity upto 2kW: ₹30,000/- per kW
  • Additional rooftop solar capacity upto 3kW: ₹48,000/- per kW
  • Rooftop solar capacity beyond 3kW: Capped at ₹78,000

Meanwhile, the subsidy for group housing society or resident welfare association is ₹ 18,000 per kW for common facilities, which includes EV charging of up to 500 kW capacity (@3 kW per house). The upper limit of the subsidy will include individual rooftop plants planted by resident individuals.

Conclusion

The sooner you install the rooftop solar panels, the more chances there are to enhance environmental sustainability and minimise electricity costs.

However, installing the panels without considering the mentioned parameter may lead to future complications. Thus, ensure you get professional guidance regarding rooftop solar Maharashtra.

Also, stay updated with the latest developments concerning solar incentives and subsidies released by the government of India and make smart financial choices.